Home / Shop / Crypto Mining Parts / Water Cooling / Bitmain ANTRACK V2-EC4-DTHP | BT-MINERS

Bitmain ANTRACK V2-EC4-DTHP | BT-MINERS

5 out of 5

US$8,888.00

  • coinpal
  • mastercard
  • amex
  • discover
  • ethereum
  • ideal
  • Zelle
  • boost
  • caixa
  • pix

Bitmain ANTRACK V2-EC4-DTHP

Please note that the current price for this product does not include shipping fees. After ordering, kindly contact your sales manager/Customer Service Robot or email (sales@bitmain.com) to confirm your shipping method and obtain the final shipping cost.

Specifications

Product Glance Value
Model ANTRACK
Version V2-EC4-DTHP
Capacity 4 units ANTMINER (Hydro) or
4 units ANTMINER (U2 Hydro) or
2 units ANTMINER (U3 Hydro)
Maximum load,kW 24

 

Detailed Characteristics Value
Part 1: Mining Cabinet
Hardware Configuration
Size (Length*Width*Height), mm (without package) 1200*600*1300
Size (Length*Width*Height), mm (with package) 1460*1330*780
Net weight, kg (without package) 130
Gross weight, kg (with package) 185
Network connection mode RJ45 Ethernet 10/100M
Power Supply
Power supply AC Input voltage, Volt(1-1) 380~415V AC
Power supply AC Input Frequency Range, Hz 50~60
Power supply AC Input current, Amp(1-2) 63
Water pump
Rated power, W 450
Noise, dBA@1m 60
Lift, m 19
Size (Length*Width* Height), mm 360*210*268
Plate heat exchanger
Maximum heat exchange power, kW 30
Size (Length*Width* Height), mm 305*106*64
Diameter of water pipe connector, mm DN20
Part 2: External Cooler(1-3)
Hardware Configuration
Size (Length*Width*Height), mm (without package) 1340*570*1330
Size (Length*Width*Height), mm (with package) 1490*590*1495
Net weight, kg (without package) 235
Gross weight, kg (with package) 248
Power supply
Power supply AC input voltage, Volt(1-1) 380~415V AC
Power supply AC input frequency range, Hz 50~60
Maximum power supply AC input current, Amp(1-2) 21
Heat pump
Heating Capacity (typical), kW 32
Compressor Input (typical), kW 8
EER (typical) 3.0
Sound Level, Db(A) 50
Refrigerant R290
Heating water outlet temperature, °C 80
Fan
Rated power, W 500
Noise, dBA@1m 50
Size (Length*Height*Thickness), mm 551*551*160
Water pump
Rated power, W 180
Noise, dBA@1m 30
Size (Length*Width* Height), mm 130*551*129
Environment Requirements
Ambient temperature, °C -20~40
Water flow, L/min 32.0~40.0 (Cabinet side)
Water flow, L/min 32.0~40.0 (Heating side)
Water pressure, bar ≤3.5
Working fluid(1-4) Organic Antifreeze (10%)
Installation distance, m(1-5) 50
Liquid PH 7.8~8.5
Storage temperature, °C -20~70
Operation humidity(non-condensing), RH 10~90%

Notes:

(1-1) Caution: Wrong input voltage may probably cause miner damaged.

(1-2) Three-phase AC input.

(1-3) Please keep the ANTRACK’s ambient temperature between 15 °C and 45 °C. Maintain at least 1 m of clearance in front of and behind the unit, and ensure adequate room ventilation to prevent exhaust-air recirculation. Under normal operation, the miner’s inlet-water temperature will be about 5 °C above ambient. When operating with older models (e.g. S19 Hyd., T19 Hyd., S19 Pro Hyd., S19 Pro+ Hyd., T19 Pro Hyd., S19 XP Hyd.), ensure the ambient temperature does not exceed 35 °C.

(1-4) If the water conductivity is ≥100 μs/cm, the fluid must be replaced. The water conductivity is less than 20 μs/cm when the system is running at the first time.

PS: An ANTRACK unit features four rack slots, each equipped with one network cable and one power cable tailored for Hydro-cooling miners. The unit also includes a water pump, eight fans, a heat exchanger and a plate heat exchanger.

For smooth operation of the ANTRACK system, please prepare the following additional items:
• A three‑phase, five‑core 380–415 V AC power cable (6AWG)
• An Ethernet cable
• 20 L of 10 % antifreeze

Estimate time

Please select your preferred product batch –  Available Now (In Stock) for immediate shipment or Month Batch for delivery within your chosen timeframe. If no selection is needed, the product is in stock and ready to ship. If you haven’t received your miner after the estimated time, please contact us at store@bt-miners.com, and our team will assist you promptly.

 

Shipping

All used miners will undergo testing by our certified technicians before shipping, which requires 3-5 business days. New miners will be shipped from our Shenzhen or Hong Kong warehouse, with international delivery taking approximately 5-10 business days via DHL. Once your order is shipped, you will receive a confirmation email with a tracking number. Shipping fees are calculated based on product type and weight, varying by region.

 

Returning policy

All sales are final and non-refundable after shipment, but we offer repair and replacement services if there are technical issues with your miner.

 

Add a review